{"id":345,"date":"2023-07-20T03:03:18","date_gmt":"2023-07-20T03:03:18","guid":{"rendered":"http:\/\/www.mokandco-eng.com\/v1\/?page_id=345"},"modified":"2023-07-20T03:07:48","modified_gmt":"2023-07-20T03:07:48","slug":"345-2","status":"publish","type":"page","link":"http:\/\/www.mokandco-eng.com\/v1\/345-2\/","title":{"rendered":"Retrofitting, Factory Acceptance Testing, Technical Manpower Supply, Emergency &amp; Other Services"},"content":{"rendered":"\n<ul>\n<li>6.6kV &amp; 415V Relay Programming, Retrofit &amp; Re-engineering c\/w ATS Scheme (REF542plus to REX640 &amp; RET620) for SS24, SS5 &amp; SS13B, MRCSB, Malaysia Refining Company Sdn. Bhd. \u2013 Malacca (2022)<\/li>\n\n\n\n<li>ABB REV615 TNB Compliance Testing, ABB Malaysia (2022)<\/li>\n\n\n\n<li>11kV &amp; 415V Relay and Circuit Breaker Retrofit (ABB, REJ601, Delab), Mid Valley Megamall (2020-2021)<\/li>\n\n\n\n<li>33kV ABB (REX640 &amp; REM620) Logic Programming, Retrofitting for SS50 MRCSB, Malaysia Refining Company Sdn. Bhd. \u2013 Malacca (2021)<\/li>\n\n\n\n<li>11kV &amp; 6.6kV ABB (REF630) Logic Programming, Retrofitting, Regenerate AutoCAD drawing for OPTIMAL Project, Petronas Chemicals Derivatives Sdn. Bhd. \u2013 Kerteh, Terengganu (2019)<\/li>\n\n\n\n<li>Retrofitting VCB, Relay, Regenerate AutoCAD drawing for TNB Pulau Redang (2019)<\/li>\n\n\n\n<li>Supply, Installation and Programming of ABB AC500 PLC Retrofit on PSR1 Rejuvenation Project OSTA2017 and TA2018 at Petronas Penapisan Melaka<\/li>\n\n\n\n<li>IMCS Programming on ABB LV Switchgear for Rapid Project Package 14 (2017)<\/li>\n\n\n\n<li>PLC Programming on ABB YUMI Robot Intergrated &#8211; Molex Project, Singapore (2017)<\/li>\n\n\n\n<li>PLC Programming Tunnel Fire Alarm Monitoring System at Singapore LTA (2016)<\/li>\n\n\n\n<li>PLC Programming on EHS Alarm Monitoring System at ST Marine, Singapore (2016)<\/li>\n\n\n\n<li>PLC Programming on SKD Drawer VSD Gateway, Singapore (2016\/17)<\/li>\n\n\n\n<li>LV Air Circuit Breaker (ACB) replacement for Swanmet (M) Sdn Bhd Melaka (2009-February)<\/li>\n\n\n\n<li>LV 415V OCEF Relay replacement for I.M.U (International Medical University Kuala Lumpur. (2008 \u2013 December)<\/li>\n\n\n\n<li>LGAST Petronas Carigali, Labuan. (2008 \u2013 October \/ December)<\/li>\n\n\n\n<li>Technical Support for LGAST Project 415V Gas (2sets) \/ Diesel (1 Set) Turbine (2500kW) at<\/li>\n\n\n\n<li>SEG CSP-F3 Multi Function Relay replacement and Testing calibration works at Time Square Commercial Building, K.L. (2008 \u2013 August)<\/li>\n\n\n\n<li>Supply Technical Personnel for Busbar \u2013 Busduct Installation work at Technip project Olefin Vietnam Quang Nai. (May \u2013 June 2008)<\/li>\n\n\n\n<li>Project Commissioning \/ Supervision on 11.5kV-40MW Steam Turbine Generator at Sabah IPP-100 Kota Kinabalu. (2008 June)<\/li>\n\n\n\n<li>Canon Machinery (M) Sdn Bhd Electrical Switchboard Cabling Works \u2013 Shah Alam. (2008 \u2013 May)<\/li>\n\n\n\n<li>Technical Personnel for ABB Malaysia for solving defect works at Jimah Power Plant Sepang and Tuanku Jaafar Power Plant Phase II (PD2) Port Dickson. (April \u2013 June 2008)<\/li>\n\n\n\n<li>Petronas Olefin MLNG Petronas Plant Bintulu 415V Generator and Normal Incomer closing control modification and testing works. (2008 May)<\/li>\n\n\n\n<li>To supply Technical Personnel for Installation Supervision Works for ABB Malaysia at Doha Ras Laffan Qatar. (2008 April \u2013 June)<\/li>\n\n\n\n<li>132kV Transformer Un-Tank for Inspection work and Insulation Oil Purification Works for MOX Bukit Rajah, Selangor. (2008 March)<\/li>\n\n\n\n<li>Supply Electrical Technical Personnel for Sabah KK IPP-100 Generation Plant for Commissioning Works. (2008 March)<\/li>\n\n\n\n<li>Qatar Olefin Plant \u2013 Doha 415V ABB SACE E4 4000A rated breaker mechanical troubleshooting on defects found. (2008 March)<\/li>\n\n\n\n<li>MG3 Melaka Petronas Refinery Extension Plant ABB REF542+ Relay Technical Support and Modification Works. (2008 March)<\/li>\n\n\n\n<li>Protection Relay ABB INSUM Configuration and Technical Support at OPTIMAL Petronas Plant Paka. (2008 February)<\/li>\n\n\n\n<li>11kV Chiller Board Protection Relay Retrofit Works for SFG (M) Sdn Bhd at Megamall K.L. (2008 January)<\/li>\n\n\n\n<li>415V Technical Support \/ Troubleshooting at A.B.F Petronas Plant Bintulu. (2008 January)<\/li>\n\n\n\n<li>Dung Quat Refinery, Vietnam (Petrovietnam) \u2013 Supply Technical Manpower (1 Person) for ABB Malaysia Commissioning Works (2007\/08)<\/li>\n\n\n\n<li>Mechanical Work of LV 415V Board Panel at Tangguh LNG Project \u2013 Indonesia BABO. (2007 Sept\/Oct)&nbsp;<\/li>\n\n\n\n<li>Pre-Commissioning Work and Calibration Works of 6.6kV VCU and 415V Starter Panels at CTOC Cakerawala Platform Petronas Carigali under Kencan Pinewell Sdn Bhd. (2007 August \/ September)<\/li>\n\n\n\n<li>Protection Relay Calibration Works at CTOC \u2013 Cakerawala Platform Petronas Carigali under ABB. (2007 July \/ August)<\/li>\n\n\n\n<li>Protection Relay Programming of Setting and Calibration Works for GE MM2 at CTOC Cakerawala Platform Petronas Carigali under Kencan Pinewell Sdn Bhd. (2007 June\/July)<\/li>\n\n\n\n<li>Protection Relay Technical Support on behalf of ABB Malaysia at Labuan Kikih SPA Offshore Platform. (2007 June\/July)<\/li>\n\n\n\n<li>Technical Support and Relay Calibration Works for ABB MNS02 INSUM Relays (under ABB contract) at Shell M3 Plateform Miri Sarawak. (2007 June \/ July)<\/li>\n\n\n\n<li>Wisma Lim Foo Yong (Jone Lang Wootton ) Retrofit Relay Works for MSB. (Jan 2007)<\/li>\n\n\n\n<li>3.3kV Load Shedding Control Retrofit Work at Talisman Offshore BR-A Plateform (Under ABB) (Feb 2007)<\/li>\n\n\n\n<li>ABB MNS 415V Boards Diagnostics Testing on Live Circuits at BASF Plant, Gebeng kuantan. (Feb 2007)<\/li>\n\n\n\n<li>Technical Support and Works Supervision at Belawan PLN Power Plant, Medan Indonesian. (March 2007)<\/li>\n\n\n\n<li>SEG Under Voltage Relay Retrofit Work at Petronas Gas CUF Gurun Kedah. (April 2007)<\/li>\n\n\n\n<li>Calibration of Frequency Relay on Change of Rate Feature at Ineax office Bkt Kemuning, Selangor for Brunei Shell Project II. (2007 May)<\/li>\n\n\n\n<li>Protection Setting Study \/ Retrofit and Re Commissioning Testing Works of 6.6kV Motors for Gas Turbine at TNBG Paka, Terengganu. (Jan 2007)<\/li>\n\n\n\n<li>ABB Subang \u2013 Tests of 415V ABB MNS Switchgears for Tg Bin Projects. (2006 February)<\/li>\n\n\n\n<li>To supply and install completed with testing of Energy Meter at Mitsui Copper Foil (M) Sdn Bhd, Shah Alam. (2006 February)<\/li>\n\n\n\n<li>Protection Relay Setting \/ Fault Calculation works for Western Digital at Thailand. (2006 February\/ March)<\/li>\n\n\n\n<li>Emergency Service at Mega Steel \u2013 LION Group Banting; Transformer 5kV\/700Vac 825kVA HV flashover Tripping. (2006 March)<\/li>\n\n\n\n<li>Calibration of Frequency Relay on Change of Rate Feature at Ineax office Bkt Kemuning, Selangor for Brunei Shell Project. (2006 March)<\/li>\n\n\n\n<li>Emergency Service at Malex Inductries Product Sdn Bhd, Petaling Jaya; Transformer 1500kVA 11kV\/433V Off Load Tap Changer Breakdown. (2006 April)<\/li>\n\n\n\n<li>Protection Relays Setting Discrimination Studies Service of All 22kV System in Western Digital \u2013 Thailand Bangkok. (2006 April)<\/li>\n\n\n\n<li>ABB Subang \u2013 Thailand Bangkok Western Digital Project 22kV Switchgear Factory Inspection and Testing Works (FAT). (2006 April \/ May)<\/li>\n\n\n\n<li>Testing of 11.5kV ISO-Phase Busduct &amp; High Rate Current Transformer in Generator Stator at Powertek Teluk Gong Melaka. (2006 May)<\/li>\n\n\n\n<li>Project Supervision (11.5kV and 415V Scheme) at Sabah IPP-100 Kota Kinabalu. (2006 July \/ August)<\/li>\n\n\n\n<li>11kV Incomers and Tie Interlocking and Intertripping Scheme modification and testing works at Main Intake S\/S BP Chemical (M) Sdn Bhd, Gebeng Kuantan. (2006 Sept.)<\/li>\n\n\n\n<li>11kV Main Busbar Differential Protection Scheme Testing and Trouble Shooting at BP Chemical (M) Sdn Bhd, Gebeng Kuantan. (2006 September)<\/li>\n\n\n\n<li>Electrical Training Course for Western Digital (Thai) Co., Ltd, Bangkok, Thailand. (2006 September)<\/li>\n\n\n\n<li>ABB MNS 380V LV Panel re-solved client defect at San Isidro Powertek, Quillota Chile. (2006 Oct \/ November).<\/li>\n\n\n\n<li>DOLPHIN Energy, Qatar (DEL) &#8211; Supply Technical Manpower (6 Persons) for Qatar ABB Malaysia Project. (2006 \u2013 2008 Contracts)<\/li>\n\n\n\n<li>Emergency Breakdown Service at San Plastic Air Keroh Melaka on 11kV R.M.U Gears. (2006 Dec)<\/li>\n\n\n\n<li>Emergency Transformer Breakdown Service at Grand Blue Wave Hotel. Shah Alam (2005 July)<\/li>\n\n\n\n<li>Emergency Troubleshooting of 415V MSB on Earth Fault Tripping at Puteri Palma Condominium, IOI Resort, Puchong. (2005 August)<\/li>\n\n\n\n<li>Supply and Install OCEF Protection Relay at 415V MSB Grand Bluewave Hotel, Shah Alam. (2005 November)<\/li>\n\n\n\n<li>Protection Relay repair work for Grand Blue Wave Hotel, Shah Alam. (2005 December)<\/li>\n\n\n\n<li>Supply and Install of OCEF Protection Relay at 415V MSB Seremban Parade, Seremban. (2005 December)<\/li>\n\n\n\n<li>Supply &amp; Install of Substation Battery completed with testing at WPJ002-Putrajay Precient No. 9 &amp; Kota Damansara. (2005 December)<\/li>\n\n\n\n<li>Troubleshooting Works- RED615 Line Different<\/li>\n\n\n\n<li>Commissioning Test on 11kV Switchgear at TNB Substation (Jan 2019)<\/li>\n\n\n\n<li>Commissioning Test on 11kV Switchgear at TNB Substation -Perak (March 2019)<\/li>\n\n\n\n<li>Investigation of Transformer Humming Sound- Johor<\/li>\n\n\n\n<li>Modification of MCC Compartment to ACB Compartment-Brunei Shell (2019)<\/li>\n\n\n\n<li>Provide Man Services in Conducting Infrared Thermal Mapping-Bank Negara Malaysia-2019<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/pages\/345"}],"collection":[{"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/comments?post=345"}],"version-history":[{"count":3,"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/pages\/345\/revisions"}],"predecessor-version":[{"id":353,"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/pages\/345\/revisions\/353"}],"wp:attachment":[{"href":"http:\/\/www.mokandco-eng.com\/v1\/wp-json\/wp\/v2\/media?parent=345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}